Pharmaceutical Industry Natural Gas Atmospheric Pressure Fire Tube Boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :Pharmaceutical Industry Natural Gas Atmospheric Pressure Fire Tube Boiler
  • Supply Capacity : 10 units/month :Pharmaceutical Industry Natural Gas Atmospheric Pressure Fire Tube Boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Industrial Flow Meter Applications - Smart Measurement

    Natural gas supply lines. From the ALVTN-Mass mass flowmeter, the saturated steam flows to the top of an internal boiler in a shell-and tube heat exchanger. Wort rises through the tube bundle in the heat exchanger while heated by the down flowing steam, which begins to condense. Landfill gas is very humid, at low pressure (20-40 mBarg Get Price

  • INNERGY HOME

    Industrial boiler with hot/superheated water burner available in all types of configurations. The industrial boilers INNERGY can be designed and manufactured with different types of configurations: coils, water-tube, fire-tube or mixed. Automatic …Get Price

  • Energy & Fuels | Vol 36, No 1

    Jan 06, 2022 · Ash Aerosol and Deposit Formation from Combustion of Coal and Its Blend with Woody Biomass at Two Combustion Scales: Part 2─Tests on a 471 MWe Full-Scale Boiler. Xiaolong Li*, Seyedhassan Fakourian, Boden Moyer, Jost O. L. Wendt, and ; Andrew Fry*Get Price

  • Fundamentals of Mechanical Engineering - EIT | Engineering

    6.13 Manufacturing processes in oil and gas industry 150. 6.14 Summary 150. 7 Mechanical Automation 151. 7.1 Sensors and actuators 151. 7.2 Differential transformers 158. 7.3 Velocity and motion 162. 7.4 Fluid pressure measurement 164. 7.5 Liquid flow measurement 165 resistant to water and atmospheric corrosion. Used for boiler fitting Get Price

  • INNERGY HOME

    Industrial boiler with hot/superheated water burner available in all types of configurations. The industrial boilers INNERGY can be designed and manufactured with different types of configurations: coils, water-tube, fire-tube or mixed. Automatic …Get Price

  • Industrial Flow Meter Applications - Smart Measurement

    Natural gas supply lines. From the ALVTN-Mass mass flowmeter, the saturated steam flows to the top of an internal boiler in a shell-and tube heat exchanger. Wort rises through the tube bundle in the heat exchanger while heated by the down flowing steam, which begins to condense. Landfill gas is very humid, at low pressure (20-40 mBarg Get Price

  • Auxiliary Boilers - SlideShare

    Jun 08, 2018 · The boiler should be cleaned if the pressure loss lies approx. 20 mm WC above the pressure loss in a clean boiler.(At the specified MCR - Maximum Continuous Rating -of the engine, the total back pressure in the exhaust gas system after the turbocharger (as indicated by the static pressure measured in the piping after the turbocharger) must not Get Price

  • Auxiliary Boilers - SlideShare

    Jun 08, 2018 · The boiler should be cleaned if the pressure loss lies approx. 20 mm WC above the pressure loss in a clean boiler.(At the specified MCR - Maximum Continuous Rating -of the engine, the total back pressure in the exhaust gas system after the turbocharger (as indicated by the static pressure measured in the piping after the turbocharger) must not Get Price

  • Energy & Fuels | Vol 36, No 1

    Jan 06, 2022 · Ash Aerosol and Deposit Formation from Combustion of Coal and Its Blend with Woody Biomass at Two Combustion Scales: Part 2─Tests on a 471 MWe Full-Scale Boiler. Xiaolong Li*, Seyedhassan Fakourian, Boden Moyer, Jost O. L. Wendt, and ; Andrew Fry*Get Price

Discount
7X24 Online